土地
199043 平方英尺
(18,492平方米)
无
2025年04月03日
已上市 67 天
4.5-acre parcel located off road for ease of access to local transportation routes. All utilities are nearby. The High Desert continues to demand additional housing with major development projects including Brightline West’s High-Speed Rail and the Barstow International Gateway (BIG). With stops in Apple Valley and Hesperia, the High-Speed Rail will travel a route of 218 miles and reach top speeds of 186 mph. The project will bring an estimated 10,000 jobs to the area throughout it’s development and is under construction in Las Vegas, full service expected by December 2028. The rail will enhance connectivity between the High Desert, Las Vegas, and the greater Los Angeles area. Barstow is nearing completion of their General Plan Update to welcome BIG, a state-of-the-art intermodal distribution facility run by BNSF Railroad. Spanning 4,500 acres and bringing an investment of $1.5 billion dollars, BIG aims to relieve the Ports of Los Angeles and Long Beach by importing freight directly from ship to rail, where it will be received and broken down for regional and domestic distribution. This forthcoming project will maximize supply change and bring an estimated 20,000 jobs to the Barstow area. Buyer to verify all information contained herein. Agent and their representatives are not responsible for the accuracy of these claims.
中文描述选择基本情况, 帮您快速计算房贷
除了房屋基本信息以外,CCHP.COM还可以为您提供该房屋的学区资讯,周边生活资讯,历史成交记录,以及计算贷款每月还款额等功能。 建议您在CCHP.COM右上角点击注册,成功注册后您可以根据您的搜房标准,设置“同类型新房上市邮件即刻提醒“业务,及时获得您所关注房屋的第一手资讯。 这套房子(地址:0 Calleja Rd Adelanto, CA 92301)是否是您想要的?是否想要预约看房?如果需要,请联系我们,让我们专精该区域的地产经纪人帮助您轻松找到您心仪的房子。